List of Some Completed Activities:

  • Fabrication of 2,000 tons of steel structures for Jahan Ara Arvand Steel
  • Installation of 4,000 tons of steel structures for Jahan Ara Arvand Steel
  • Fabrication of 4 Tundishes (15 tons each) and Tundish Covers
  • MHS – Additives Silos
  • Furnace Exchange Device
  • Slab Head & Tail Scrap and Sample Collector
  • Burr Removal Car
  • Tundish Tilting Stand
  • Vertical Bender – Moving Frame Tilting
  • Vertical Bender – Water Test
  • Strand Fume Exhaust System
  • Scrap Bucket
  • Scrap Bucket Transfer Car
  • Empty Ladle Transfer Car
  • Mould and Segment Transfer Car
  • Lifting Yoke
  • Ladle Lifting Beam
  • Dummy Bar
  • Ladle Slide Gate Cylinder Connecting Platform
  • Mould Maintenance Stand
  • Segment Moving Frame Tilting
  • Segment Water Test
  • Segment Hydraulic Test Stand
  • Segment Roll Racks
  • Segment Cylinder Rack

Project Details

Design, Fabrication, Installation, and Commissioning