Sirjan Iranian Steel Project
Sirjan Iranian Steel Project
Project Description
This company is currently a subsidiary of the Middle East Mines & Mineral Industries Development Company (affiliated with Pasargad Bank). Roshan Sanat has been one of the main contractors in the construction of a steel billet production plant with a capacity of 1 million tons in Bardsir County, and an iron ore pellet production plant with a capacity of 2.5 million tons in Sirjan County.
Steelmaking Equipment with a Capacity of 1.5 Million Tons per Year
| Project Type | Fabrication |
| Designer | Danieli Company, Italy |
| Client | TAM Iran Khodro Company |
| Approximate Equipment Weight | 630 tons |
| Fabrication Duration | 16 months |
| Project Year | 2017–2018 |
List of Fabricated Equipment
- Wire Feeding Machine
- Ladle Turret
- Beam & Handrail Lateral comb transfer (provision for lifting in future)
- Walking beam cooling bed (turnover type)
- Pusher collecting table
- Intermediate roller table assembly
- Cutting area roller table assembly (with 6 strand)
- Transport roller table assembly (with 6 strand)
- Tundish assembly
- Slag boxes & semicircular lauder
- Tundish stands
- Tundish lifting beam
- Tundish tilting device
- Mould tilting device
- Ladle shroud manipulator
- FNC maintenance tundish stand
- Mould quick changing device