Jahan Steel Sirjan Project
Jahan Steel Sirjan Project
Project Description
Rowshan Sanaat Engineering Company, as an engineering contractor, has established various direct and indirect contracts with Jahan Steel Sirjan for the fabrication of equipment for Smelting Plant 1 (with an annual capacity of 1,000,000 tons of billets) and the Sirjan Reduction Plant (with an annual capacity of 960,000 tons) in Sirjan County. All equipment is currently installed on-site and in opetion.
LF Transfer Car
| Project Type | EPC |
| Client | Jahan Steel Sirjan |
| Capacity | 300 tons |
| Approximate Dimensions (L×W×H) | 8 m × 6 m × 2.5 m |
| Equipment Weight | 45 tons |
| Other Accessories | Gearbox motor, electrical panel, automatic coupling for gas connection to ladle body, cable reel, refractory work |
| Fabrication Duration | 5 months |
| Project Status | Delivered and Operational |
EAF Transfer Car
| Project Type | EPC |
| Client | Jahan Steel Sirjan |
| Capacity | 300 tons |
| Approximate Dimensions (L×W×H) | 8 m × 6 m × 2.5 m |
| Equipment Weight | 50 tons |
| Other Accessories | Gearbox Motor |
| Fabrication Duration | 6 months |
| Project Status | Delivered and Operational |
DRI Transfer Conveyors to Reduction Furnace and Inside Smelting Hall
| Project Type | EPC |
| Number of Conveyors | 12 units |
| Client | Kani Mes Company |
| Conveyor Capacity | 500 tons per hour |
| Total Conveyor Length | 300 meters |
| Conveyor Width | 800 and 1,000 mm |
| Conveyor Material | DRI |
| Execution & Installation Duration | 8 months |
| Construction Year | 2021 |
EAF/LF Ducts of Smelting Plant 1 Sirjan / Chimneys / Bag Filter Structure and Casing EAF/LF / Conveyor Dust Collectors / Duct Supports
| Project Type | Fabrication |
| Total Delivered Weight | 3,200 tons |
| Client | Fan Avar & Metal Mines (MMTE), Smelting Plant 1 Sirjan |
| Fabrication & Delivery Duration | 18 months |
| Construction Year | 2021 |
| Fabricated Equipment | Head Plenum, De-dusting MHS, Steel Structure-Bag Filter, DRI Bag Filter, EAF/LF Bag Filter, Primary Duct (Hot Gas Line), EAF/LF Filler Stack, Main Gas Mixing Duct, Secondary Gas Duct |
Reformer Ducts of Reduction Plant 2 Sirjan
| Project Type | Fabrication |
| Total Delivered Weight | 440 tons |
| Client | Fan Avar & Metal Mines (MMTE), Reduction Plant 2 Sirjan |
| Fabrication & Delivery Duration | 6 months |
| Construction Year | 2022 |
| Fabricated Equipment | Reformer Reformed Gas Duct, Combustion Air Header Duct, Reformer Flue Gas Duct |
Metal Structures of Reduction Plant 2 Sirjan
| Project Type | Fabrication |
| Total Delivered Weight | 430 tons |
| Client | Fan Avar & Metal Mines (MMTE), Reduction Plant 2 Sirjan |
| Fabrication & Delivery Duration | Total 5 months, executed in phases |
| Construction Year | In 3 separate contracts, 2023–2025 |
| Fabricated Equipment | Stack Pipe Bright, Desulphurization, Steel Structure, Handrail, Elevator |