Khorasan Sangan Steel Project
Khorasan Sangan Steel Project
Project Description
This company was established near the Sangan iron ore mines with the objective of sustainably producing a portion of the pellet demand of Mobarakeh Steel Company (Esfahan). Currently, the company’s pelletizing and concentrating units are each operating with a nominal production capacity of 5 million towns. Rowshan Sanaat Engineering Company has had an active role in the construction of this industrial complex. A portion of the completed projects and/or delivered equipment is listed as follows:
Waste Conveyor Systems of Sangan Steel
| Project Type | EPC |
| Number of Conveyors | 3 units |
| Conveyor Capacity | 800 tons per hour |
| Total Conveyor Length | 1,700 meters |
| Conveyor Width | 1,200 mm |
| Conveyor Material | Iron concentrate waste |
| Execution & Installation Duration | 11 months |
| Construction Year | 2019 |
Fabrication of mechanical structures for the product-section conveyor systems
| Project Type | Fabrication |
| Engineering Documents | Me'yar Sanat Khavarmiyaneh Company |
| Approximate Project Weight | 1,090 tons |
| Fabrication & Delivery Duration | 8 months |
| Fabricated Equipment | Conveyor drive stations, conveyor frames, Head Station, Tail Station, idler supports |
| Project Year | 2017 |