Jahan Steel Sirjan Project

Project Description

Rowshan Sanaat Engineering Company, as an engineering contractor, has established various direct and indirect contracts with Jahan Steel Sirjan for the fabrication of equipment for Smelting Plant 1 (with an annual capacity of 1,000,000 tons of billets) and the Sirjan Reduction Plant (with an annual capacity of 960,000 tons) in Sirjan County. All equipment is currently installed on-site and in opetion.

LF Transfer Car

Project Type EPC
Client Jahan Steel Sirjan
Capacity 300 tons
Approximate Dimensions (L×W×H) 8 m × 6 m × 2.5 m
Equipment Weight 45 tons
Other Accessories Gearbox motor, electrical panel, automatic coupling for gas connection to ladle body, cable reel, refractory work
Fabrication Duration 5 months
Project Status Delivered and Operational

EAF Transfer Car

Project Type EPC
Client Jahan Steel Sirjan
Capacity 300 tons
Approximate Dimensions (L×W×H) 8 m × 6 m × 2.5 m
Equipment Weight 50 tons
Other Accessories Gearbox Motor
Fabrication Duration 6 months
Project Status Delivered and Operational

DRI Transfer Conveyors to Reduction Furnace and Inside Smelting Hall

Project Type EPC
Number of Conveyors 12 units
Client Kani Mes Company
Conveyor Capacity 500 tons per hour
Total Conveyor Length 300 meters
Conveyor Width 800 and 1,000 mm
Conveyor Material DRI
Execution & Installation Duration 8 months
Construction Year 2021

EAF/LF Ducts of Smelting Plant 1 Sirjan / Chimneys / Bag Filter Structure and Casing EAF/LF / Conveyor Dust Collectors / Duct Supports

Project Type Fabrication
Total Delivered Weight 3,200 tons
Client Fan Avar & Metal Mines (MMTE), Smelting Plant 1 Sirjan
Fabrication & Delivery Duration 18 months
Construction Year 2021
Fabricated Equipment Head Plenum, De-dusting MHS, Steel Structure-Bag Filter, DRI Bag Filter, EAF/LF Bag Filter, Primary Duct (Hot Gas Line), EAF/LF Filler Stack, Main Gas Mixing Duct, Secondary Gas Duct

Reformer Ducts of Reduction Plant 2 Sirjan

Project Type Fabrication
Total Delivered Weight 440 tons
Client Fan Avar & Metal Mines (MMTE), Reduction Plant 2 Sirjan
Fabrication & Delivery Duration 6 months
Construction Year 2022
Fabricated Equipment Reformer Reformed Gas Duct, Combustion Air Header Duct, Reformer Flue Gas Duct

Metal Structures of Reduction Plant 2 Sirjan

Project Type Fabrication
Total Delivered Weight 430 tons
Client Fan Avar & Metal Mines (MMTE), Reduction Plant 2 Sirjan
Fabrication & Delivery Duration Total 5 months, executed in phases
Construction Year In 3 separate contracts, 2023–2025
Fabricated Equipment Stack Pipe Bright, Desulphurization, Steel Structure, Handrail, Elevator