South Kaveh Kish Steel Project

Project Description

South Kaveh Kish Steel Company, located in the Persian Gulf Special Economic Zone, is engaged in sponge iron production and steelmaking with a nominal capacity of 3 million tons of steel billets per year. Rowshan Sanaat Engineering Company began its collaboration with this company in 2013 (1392) and has been involved in the project. The delivered projects and equipment provided to this company include the following:

Ladle Transfer Car

Project Type EPC
Client Kaveh Steel South Kish
Capacity 140 tons
Approx. Dimensions (L,W,H) 7.4m * 5.7m * 2.2m
Equipment Weight 35 tons
Other Accessories Gear motor, Control panel, Weighing system
Manufacturing Time 5 months
Year of Manufacture 2014
Project Status Delivered and Operational

Steel Billet Transfer Car

Project Type EPC
Client Kaveh Steel South Kish
Capacity 30 tons
Approx. Dimensions (L,W,H) 11m * 2.3m * 1.5m
Equipment Weight 25 tons
Other Accessories Gear motor, Control panel
Manufacturing Time 4 months
Year of Manufacture 2016
Project Status Delivered and Operational

Manufacture and Delivery of 2,800 tons of Industrial Steel Structure

Project Type Construction and Installation
Total Delivered Weight 2,800 tons
Construction & Delivery Duration 16 months, phased
Fabricated Equipment Pipe racks, supporting/access structures, protective structures, walkways, handrails

Storage Silos & Hoppers

Project Type Construction
Capacity 30–80 tons
Stored Material Lime, Dolomite
Manufacturing Time 2 months
Project Status Delivered and Operational

Rotary Vibrating Feeder

Project Type EPC
Delivered Units 2 units
Approx. Capacity 350 tons/hour
Construction Duration 4 months
Material Type DRI (Direct Reduced Iron)
Additional Items Electrical Panel, Magnetic Drive
Installation Location Below DRI Storage Silos
Project Status Delivered and Operational

Construction of Emergency Water Storage Tanks

Project Type Construction
Number of Tanks 4 units
Approx. Pressure 4 bar
Capacity 25,000 m³
Construction Duration 2 months
Project Status Delivered and Operational

OMHS – Raw Material Transfer System from Reduction and Ferroalloy Area to Steel Melting Shop

Project Type EPC
Total Capacity 700 tons/hour
Total Delivered Line Length 2.7 km
Approx. Total Weight 1,200 tons
Construction & Delivery Duration 14 months including installation and commissioning
Project Status Delivered and Operational
Project Description
This project was defined in 2015 (1394) and included basic and detailed design, construction, installation, and commissioning of all steel structures, foundation modifications, manufacturing and supply of mechanical equipment and foreign procurement, design and implementation of power and control systems, panel construction and delivery, automation commissioning, and final integration of the automation system of the constructed lines with the central plant control system.